国产娇喘精品一区二区三区图片_国产无人区一区二区三区_欧美性猛交一区二区三区_一区二区欧美在线

導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

能夠提高油藏管理水平的智能完井技術(英)

[加入收藏][字號: ] [時間:2009-02-19 E&P 關注度:0]
摘要:簡介:進行智能完井能夠提高油藏管理水平,由于采用了一系列新技術,現在可以進行的監測內容遠多于壓力和溫度。 First conceived as alternatives to costly or technically difficu...
簡介:進行智能完井能夠提高油藏管理水平,由于采用了一系列新技術,現在可以進行的監測內容遠多于壓力和溫度。

First conceived as alternatives to costly or technically difficult interventions, intelligent wells that can be monitored and controlled remotely have evolved into a powerful reservoir management tool. As a result, after initially slow industry-wide uptake, their number is projected to increase fivefold in the next five years. 


At the heart of intelligent wells are surface-actuated downhole valves, used to regulate flow from individual zones or laterals, and permanent downhole temperature and pressure sensors. Today, downhole control valves range from those with simple on-off controls to hydraulically actuated and electrically controlled, infinitely variable-setting chokes. These innovations permit engineers to design valves that can be remotely adjusted within a range of cross-sectional flow areas matched to a zone’s production profile. Schlumberger now reports a 97% reliability rate for its second-generation valves.

While the initial objective of intelligent well technology?extending well life?was effective, that was not the most efficient use of the technology. Instead, the technology’s true promise, the industry has come to understand, is best realized when intelligent wells are used as a tool for maximizing reserves recovery. This change in intelligent well identity ? from intervention avoidance to reservoir management tool ? has been greatly enhanced by the emergence of robust downhole permanent pressure and temperature sensors capable of functioning in harsh environments for extended periods of time. Their new role has also been furthered by increased longevity, the result of more reliable electrical connections that in the past had been a weak link in downhole electronics. Today, fully redundant, independently testable, mechanical and full-welded connectors and splices have delivered a step-change improvement in reliability.

Because of these new technologies, monitoring today includes much more than pressure and temperature data. Permanent downhole multiphase flowmeters, seismic sensors, and electrodes have been included to deliver formation imaging away from the well bore, and they are all being connected through control centers that facilitate almost instantaneous responses to changing conditions. Data from these intelligent completions are also used to continually enhance and update production models and simulations, perform and interpret production tests on individual zones and laterals, predict sand and water encroachment, and measure flow rate and water cut.

Smart choice

The advantages of reservoir monitoring and control are obvious. For example, since wells seldom cross only a single hydrocarbon-bearing zone, completion engineers are often forced to decide between commingling production from multiple zones and producing each zone sequentially. Historically, producing more than one zone at a time has been an option only when the zones are of compatible pressure and fluid composition, and no regulatory concerns exist. Two, three, and sometimes four perforated intervals also can be produced at the same time through completions in which each zone is mechanically isolated from the others and flowed to the surface through separate production strings.

Sequential production typically requires flowing one zone to its economic limit before plugging and abandoning it in order to move up the hole to complete the next zone.

This cycle is then repeated until all zones have been depleted. In almost all cases, this strategy leaves behind considerable reserves and results in poor production profiles because of extended periods of depletion within each zone.

In contrast, using intelligent completions in a sequential production scheme, which involves opening and closing each zone remotely from the surface, improves production by eliminating both intervention costs and poor production profiles. Variable-setting valves can also be used to eliminate sequential production in favor of commingling by managing flow from high-pressure zones to prevent crossflow.

This does not mean that intelligent completion technology guarantees added value wherever it is applied. Experience has shown that the degree to which production is improved by intelligent completions depends on such factors as porosity and permeability distribution within that reservoir. The decision to use intelligent wells does not require every well in a smart field to be an intelligent completion. The operator must first ascertain that the reservoir type in a given field is suitable for intelligent well technology and then make a similar determination for each well planned for the field.

Candidate screening processes range from a simple analytical approach to complex reservoir models. Given such inherent uncertainties as reservoir characteristics, produced fluid composition, well performance, and recovery efficiency, it is important to use a stochastic rather than deterministic approach in the screening process.

Guiding parameters

General experience-based guides for choosing an intelligent well strategy have emerged over time. In a reservoir with uniform permeability, for instance, remotely actuated valves would seem, at first glance, to be an effective tool for managing water influx and therefore increasing well life and ultimate recovery. But if the completion is to be set across a relatively short interval within that reservoir, an intelligent completion may not be economically justified since a sufficiently uneven fluid front may not develop. In other words, the oil and water streams may not be sufficiently distinct to allow control of one fluid flow stream without affecting the other, and an intelligent completion would be a waste of money.

While intelligent completions can be effective in layered reservoirs, for obvious reasons they are decidedly more efficient when the shale zone separating the sands is continuous and the seal impermeable. Therefore, within the same layered reservoir, some wells crossing reliably sealed layers are well-served by intelligent completions.

One set of mathematical models developed for candidate screening uses reservoir simulation and well simulation techniques to generate a comparative model of the benefits of intelligent completions. Scenarios are created to generate variance in reservoir performance affecting the timing of events requiring intervention, reservoir monitoring, or reservoir management and are often driven by geological uncertainty and reservoir heterogeneity.

In heterogeneous channel reservoirs, the benefits of intelligent completions depend on well performance, which, in turn, depends on well placement with respect to the permeability of the formation and connectivity of the channels. That is because the effectiveness of flow control valves depends on choking, which is a function of high deliverability. By their nature, however, the majority of heterogeneous reservoirs benefit from intelligent completions since their varying permeability and porosity tend to create just the kind of fluid front that variable-setting valves can best exploit.

Team effort in Saudi Arabia

In 2004, Saudi Aramco engineers drilled and completed a maximum reservoir contact (MRC) well as a proof-of-concept project. The well is in the Haradh field, the designation given the southwest portion of Saudi Arabia’s giant Ghawar field. The Haradh area was brought on production in three successive increments over nearly 10 years from May 1996 to January 2006. While Increment I was developed using conventional completions wells, experience led Saudi Aramco engineers to eventually include MRC, multi-laterals, and intelligent completions in final Increments II and III.

The A12 well in the Haradh area was originally completed from a horizontally set, 7-in. line. A 61⁄2-in. horizontal openhole section was then drilled from the bottom of the liner and a 41⁄2-in. liner set across a section that had incurred heavy fluid losses during drilling of the main well bore. Two more 61⁄2-in. laterals were drilled from the 7-in. liner and left as “barefoot,” or openhole, completions.

With this standard multilateral completion, no water was produced initially, but in less than one year, water cut had reached about 23%. As a result, available drawdown and overall production were reduced and treatment and disposal costs rose, prompting the operator to deem water-production control imperative.

In response, Schlumberger designed and deployed an intelligent completion system with multiposition, downhole flow control valves and surface flow-rate measurements to selectively manage water production from each of the three zones. Through optimization of the downhole control valves, water cut was reduced from 23% to almost zero.

The successful application of intelligent wells to the Haradh field, as detailed in a paper presented at the 2007 International Petroleum Technology Conference, held in Dubai, was the result of a project-management approach to the design, planning and installation processes. Five Schlumberger segments teamed with the Saudi Aramco facilities, production, drilling and workover; reservoir management; and reservoir description departments. Schlumberger and Saudi Aramco’s reservoir management and reservoir description departments built a multilateral well model in PIPESEM production system analysis software to calculate pressures opposite each lateral at various water cuts. The simulation estimated lateral performance across the valves over a range of pressure and flow rates.

Prior to starting the project, more than 30 multidisciplinary team members from Schlumberger and Saudi Aramco participated in a two-day forum to plan the project, run the completion on paper, agree on the design criteria and running procedures, and define responsibilities. Participants jointly developed a list of 28 action items in an effort to ensure a trouble-free operation.

The field team consisted of a completions installation crew, a reservoir evaluation wireline crew, a coiled tubing crew, and a multiphase flow testing crew managed through the Schlumberger advanced completions project manager. In view of the well’s workover history and the possible presence of casing deformations capable of affecting intelligent completion installation, the reservoir evaluation wireline and well services segments ran a USI UltraSonic Imager corrosion log on coiled tubing. The run confirmed the integrity of the casing and the suitability of QUANTUM gravel pack and MultiPort bypass packers with multiple porting. Using a PhaseTester portable multiphase well production monitoring system and the InterACT real-time monitoring and data delivery system, the team optimized the intelligent completion performance. This enabled the

Saudi Aramco engineers at their offices in town to adjust downhole flow-control valve settings in real time to maximize oil production and minimize water cut. 

During equipment testing and installation, and subsequent flow testing of the well, each of the valves was actuated through more than 10 complete cycles?110 position changes, or the equivalent of several years of typical operation. The well was fully flow-tested and put on production with minimal water production. Saudi Aramco engineers reported at the 2007 IPTC meeting that without the intelligent well approach, the well would have watered out and ceased production.

Tubing- and wireline-retrievable flow control valves. These intelligent flow control valves, unlike their predecessors, do not require wireline or coiled tubing intervention to close, open, or infinitely adjust the flow area. Instead, they are remotely actuated through a hydraulic capillary tube (left) or, in the case of the electrical systems, through an electrical signal to electromechanical actuators (right). Both valves shown are tubing-retrievable.
關鍵字: 油藏管理 完井 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
毛片网站在线看| 青草视频在线免费直播| 精品国产乱码久久久久久老虎| 国产伦精品一区二区三区免.费| 国产成人精品免费在线| 亚洲av综合色区无码另类小说| 综合国产视频| 一本一道久久a久久综合精品| 51av在线| 国产精品视频久久| 亚洲激情文学| 日韩在线观看精品| xxx免费视频| 日韩女优av电影在线观看| 天堂av资源在线| 亚洲精品国产成人久久av盗摄| 国产午夜福利片| 国产乱子轮精品视频| 在线观看国产免费视频| 欧美日韩日本国产亚洲在线| 国内外成人免费激情视频| 成人影院中文字幕| 亚洲一区尤物| 成人精品国产亚洲| 国产原创精品| 国产美女高潮在线观看| 91精品国产综合久久香蕉的用户体验 | 九九久久婷婷| 国产a级黄色大片| 日韩免费一级| 亚洲精品欧美精品| 99久久久国产精品免费调教网站 | 正义之心1992免费观看全集完整版| 欧美天堂视频| 国产日韩欧美一区二区| 精灵使的剑舞无删减版在线观看| 国产精品wwwwww| 国产高清视频在线观看| 97精品久久久| 日韩资源在线| 久久久免费在线观看| 超碰在线94| 美日韩精品免费视频| 波多野结衣在线中文| 国产一区二区三区精品久久久| 九色porn蝌蚪| 日韩电影在线观看永久视频免费网站| 天堂在线观看| 日韩av网站电影| 成年人网站在线免费观看| 亚洲精品www| 岛国影视在线观看| 亚洲欧美综合v| 天天操夜夜爽| 中文字幕av一区| 91人成在线| www.xxxx欧美| 高清视频在线www色| 久久久91精品| 屁屁影院在线观看| 久久久久久久999精品视频| 中国黄色在线视频| 欧美极品美女视频网站在线观看免费| 小明精品国产一区二区三区| 久久噜噜噜精品国产亚洲综合| 在线的色视频| 97人洗澡人人免费公开视频碰碰碰| 青青草视频免费在线观看| 午夜精品久久久久久久男人的天堂| 欧洲伦理片一区 二区 三区| 26uuu亚洲伊人春色| 成人精品一区| 国产视频福利一区| 91超碰在线播放| 精品国产一区二区三区免费 | www.一区二区| 国产原创视频在线| 中文字幕视频一区二区三区久| 中文字幕永久在线观看| 亚洲综合激情网| 日本美女一级视频| 欧美性大战久久久| 韩日a级毛片| 日韩电视剧在线观看免费网站| free性亚洲| 欧美成aaa人片在线观看蜜臀| 天堂中文在线8| 国产成人久久久精品一区| av免费在线网站| 国产一区二区不卡视频在线观看| 成人黄色免费观看| 日本一道在线观看| 成人一级毛片| 欧美色图校园春色| 老鸭窝一区二区久久精品| 三级影片在线看| 日本一区二区三区视频视频| 91国偷自产中文字幕久久| 欧美日韩午夜剧场| 精品成人免费自拍视频| 日韩经典中文字幕| 在线黄色国产电影| 国产成人福利网站| 日韩欧美精品一区二区三区| 亚洲乱码一区二区三区三上悠亚 | 特级西西444| 国产精品久久久乱弄| jjzzjjzz欧美69巨大| 激情五月婷婷综合网| 日本天堂在线视频| 一区二区三区波多野结衣在线观看| 天天干视频在线观看| 日韩精品一区二区三区蜜臀| 免费的av电影| 欧美在线观看视频| 麻豆视频在线观看免费网站黄| 亚洲一区二区三区精品动漫| 国精一区二区| 欧美丰满熟妇bbb久久久| 国产精一品亚洲二区在线视频| 欧美精品一二三四区| 午夜精品久久久久久久99水蜜桃| 麻豆国产视频| 日韩视频精品在线| 拍真实国产伦偷精品| 久久精品日韩精品| 色婷婷精品视频| 久久精品一二三四| 国产一区三区三区| 天天射天天干天天| 欧美亚洲自拍偷拍| 天天射天天拍| 欧美专区福利在线| 国产不卡人人| 国产制服91一区二区三区制服| 夜间精品视频| 女人裸体性做爰全过| 国产精品免费视频观看| 亚洲成人偷拍自拍| 国产亚洲欧洲高清| 香港伦理在线| 日韩一区二区三区资源| 四季av在线一区二区三区 | 久久国产日韩| 国产成人亚洲欧洲在线| 欧美日韩国产丝袜另类| 天堂在线视频播放| 97久久精品国产| 成人免费影院| 久久精品国产精品亚洲色婷婷| 久久久久久久尹人综合网亚洲| 日韩视频免费观看高清| 欧美性生活大片免费观看网址| 美国做受三级的视频播放| 韩国欧美亚洲国产| videos性欧美另类高清| 亚洲美免无码中文字幕在线| 先锋影音久久| 久久久久久久久久久影院| 久久激情网站| 欧美日韩视频免费| 久久看人人摘| 青花影视在线观看免费高清| 亚洲激情校园春色| 日本一卡2卡三卡4卡网站| 性亚洲最疯狂xxxx高清| 99蜜月精品久久91| www.精品在线| av一区二区三区四区| 天天躁日日躁狠狠躁喷水| 影音先锋日韩有码| 污的网站在线观看| 国产精品视频二| 日韩国产欧美一区二区三区| 激情网站在线观看| 日韩午夜激情av| 韩日视频在线| 杨幂一区欧美专区| 日韩午夜精品| 无码人妻精品一区二区蜜桃色欲| 3atv在线一区二区三区| 青春有你2免费观看完整版在线播放高清 | 国产成在线观看免费视频| 2018日韩中文字幕| 电影一区中文字幕| 波多野吉衣在线视频| 久久九九影视网| 国产亚洲精品午夜高清影院| 久久久久久久久久久av| 99久久婷婷国产综合精品首页| 亚洲精品mv在线观看| 久久精品视频一区二区三区| 欧美乱妇18p| 欧美亚洲另类视频| 国产aa精品| 成人无码www在线看免费| 夜夜夜精品看看| 欧美色老女人| 精品蜜桃传媒| 欧美日本一区二区高清播放视频|