<ul id="k48q0"><dfn id="k48q0"></dfn></ul>
<tfoot id="k48q0"><delect id="k48q0"></delect></tfoot>
<strike id="k48q0"></strike><del id="k48q0"><tfoot id="k48q0"></tfoot></del>
  • <ul id="k48q0"></ul>
  • 墨西哥灣深水水平井鉆井平臺起火沉沒事故

    [加入收藏][字號: ] [時間:2010-05-27  來源:博研論壇  關注度:0]
    摘要:   You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, bur...


      You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, thensank in 5,000 ft of water in the Gulf of Mexico.  There are still 11 men missing, and they are not expected to be found.  
    The rig belongs to Transocean, the world’s biggest offshore drilling contractor.  The rig was originally contracted through the year 2013 to BP and was working on BP’s Macondo exploration well when the fire broke out.  The rig costs about $500,000 per day to contract.  The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course ofdrilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.


    Nautilus, being transported on a Heavy-Lift vessel


      The rig represents the cutting edge of drilling technology.  It is a floating rig, capable of working in up to 10,000 ft water depth.  The rig isnot moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floatingstructure.  Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
    The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft.  The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
    It is thought that somehow formation fluids – oil /gas – got into the wellbore and were undetected until it was too late to take action.  With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed – the uppermost unmoving point in the well. This pressure control equipment – the Blowout Preventers, or ‘BOP’s” as they’re called, are controlled with redundant systems from the rig.  In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe Deadman systems that should be automatically engaged when something of this proportion breaks out.  None of them were aparently activated, suggesting that the blowout was especially swift to escalate at the surface.  The flames were visible up to about 35 miles away.  Not the glow – the flames.  They were 200 – 300 ft high.
     

    上一頁12345下一頁


              您的分享是我們前進最大的動力,謝謝!
    關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
    Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有
    京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
    国产精品无码专区AV在线播放| 日韩中文无码有码免费视频| 精品国产一区二区三区久久| 中文字幕无码亚洲欧洲日韩| 糖心vlog精品一区二区三区| 国产精品久久久久jk制服| 国产精品va在线观看无码| 日韩网站在线观看| 国产精品一区二区久久乐下载 | 久久精品丝袜高跟鞋| 精品无人区无码乱码大片国产| 日韩精品一区二区三区在线观看l 日韩精品一区二区三区毛片 | 亚洲精品国产首次亮相| 亚洲视频国产精品| 午夜DY888国产精品影院| 日韩精品在线视频| 国精品无码一区二区三区左线| 亚洲精品偷拍视频免费观看| 精品天海翼一区二区| 国产精品一区二区三区久久| 精品伊人久久久香线蕉| 精品国偷自产在线视频99| 99久久做夜夜爱天天做精品| 99在线精品一区二区三区| 青青青青久久精品国产| 久久夜色精品国产www| 香蕉99久久国产综合精品宅男自| 精品女同一区二区| 亚洲精品在线视频| 日韩在线一区二区| 日韩中文字幕一区| 青草热在线精品视频99app| 无码人妻精品一区二区蜜桃百度| 中文字幕日韩三级| 中文一国产一无码一日韩| 国产精品久久久精品三级| 国产精品电影网在线好看| 国产精品αv在线观看| 日韩亚洲精品福利| 国产精品伦子一区二区三区| 亚洲AV无码之日韩精品|