  • 水平裸眼井壓裂技術(英)

    [加入收藏][字號: ] [時間:2009-07-14  來源:E&P  關注度:0]
    摘要:簡介:裸眼井壓裂,可以降低完井成本。水平段壓裂新技術,在單井中注入大量壓裂液和支撐劑后,能壓裂出多條裂縫,極大的提高了油藏的采收量。在完井和壓裂水平裸眼井方面,極大的節省了鉆井時間、固井以及套管費用,降低了壓裂時間和成本,縮短了預生產時間。...
    簡介:裸眼井壓裂,可以降低完井成本。水平段壓裂新技術,在單井中注入大量壓裂液和支撐劑后,能壓裂出多條裂縫,極大的提高了油藏的采收量。在完井和壓裂水平裸眼井方面,極大的節省了鉆井時間、固井以及套管費用,降低了壓裂時間和成本,縮短了預生產時間。

    Fracturing open holes reduces the cost of well completions and allows earlier production. Innovations in horizontal fracturing have allowed large reservoir volumes to be reached and drained by creating multiple fractures in a single well through injection of several hundred thousand gallons of fluid carrying several hundred thousand pounds of proppant. It is now possible to complete and fracture horizontal wells open hole with savings in rig time, cementing and casing costs, reduced fracturing time and cost, and reduced time to production.

    Working the plan

    One of the key elements of successful exploitation of tight gas reservoirs is the ability to fracture wells according to plan and production requirements. Most plans call for placement of multiple transverse fractures at specific locations within the horizontal well. Given the low productivity of these wells, the ability to successfully create multiple fractures is of paramount importance.

    A popular method of creating multiple fractures is to use frac ports and sliding sleeves. Openhole packers isolate different segments of the horizontal well. A sliding sleeve is placed between each packer pair and is opened by injecting a ball inside the borehole. During a typical treatment, the completion string is placed inside the well. The string includes frac ports and openhole packers spaced according to well requirements. Spacing between packers can be as high as several hundred feet. The packers are actuated by mechanical, hydraulic, or chemical mechanisms. To activate each sleeve, a properly sized ball is pumped with the fracturing fluid inside the well. The ball size is smaller than the opening of all of the previous sleeves, but larger than the opening of the sleeve it is intended to open. Seating of the ball exerts pressure at the end of the sliding sleeve assembly, causing it to slide and open the frac ports. Once the port is opened, fluid is diverted into the openhole space outside the completion assembly, causing the formation to fracture.

    At the completion of each fracturing stage, the next larger sized ball is injected into the well, which opens the next sleeve, and so on, until all of the sleeves are opened and multiple fractures are created in the well.

    The main advantage of this completion technique is the speed of operations, which also reduces costs.

    Overcoming failures

    There are occasions when equipment does not function as planned, and treatment results are sub-optimal. In one treatment, nine fracturing stages were carried out over a two-day period using ball sizes of 1.25, 1.5, 1.75, 2.00, 2.25, 2.50, 2.75, and 3.00 in. During the treatment, the proppant was tagged with three radioactive tracers.

    Examining the log from this project leads to several observations:

    • The openhole packers did not keep the fracture contained. Fluid and proppant moved between some of the isolated intervals;

    • Some of the sliding sleeves did not function properly, so some intervals were not fractured at all; and

    • The fractures created were axial (longitudinal) and not dominantly transverse, as intended.

    Analyzing tool breakdown

    A look at the treatment chart for one of these treatments indicates the frac ball seating did not cause the typical sharp pressure increase. In fact, the pressure rise just before 425 minutes appears to have resulted from rapid rate increase.

    The frac ball sizes in this treatment changed in 0.25-in. increments. Since the ball had to clear the previous sleeve (which has a 0.25-in. larger opening), the difference between the ball diameter size and sleeve seat opening is 1⁄8 in., or a radius difference of 1⁄16. Since the ball is plastic and the seat is made of steel, they have different elastic and thermal expansion constants and respond differently to pressure and temperature changes. The ball having just been pumped is likely to be at surface temperature, while the seat temperature can be warmer, depending on the time lag between the two injections.

    Assuming that the ball in this example was injected at 9.2 bbl/minute, it was traveling with a velocity of over 15 ft/sec. With a small tolerance, the ball could have gone through the seat or could have shattered upon high velocity impact with the tubing wall or the seat. Whichever the cause, there is ample evidence to indicate that some balls did not seat to move the sliding sleeve and open the port.

    Another possibility in this situation is that the wrong sized ball was released at the surface and seated at an earlier sleeve, leaving several downstream intervals untreated. Once this happens, the downstream intervals are inaccessible for subsequent injections.

    Several actions can reduce the risk of failure in such cases:

    1. Larger ball size increments could be selected. A 0.5-in. separation between ball sizes would have increased the chance of success on this job.

    2. Lower injection rates could be used while seating the balls to reduce the chance of a ball breaking down and lessen the chance of the ball passing through the seat because of its high velocity.

    3. An automated ball release mechanism could be used to control the sequence. Although automated systems are slightly more expensive, the reduced risk of failure makes them attractive.

    The tracer log shows fracture propagation across the packers, which could be the result of several mechanisms:

    • Axial (longitudinal) fracture initiation and propagation. The natural tendency of hydraulic fractures in horizontal wells is to initiate axially (longitudinally). Re-orientation of these fractures to become transverse is a gradual and random process. The treatment chart for this job shows that the initial fracture was dominantly axial and continued to grow for a considerable amount of time. Even at the end of the treatment, the fracture had a considerable nontransverse component. The fracture could have crossed the packed-off interval, aided in this process by the pressure exerted on the formation by the packer itself.

    • Packer setting. If the packer is not set properly, the packer itself can fracture the formation.

    • Wellbore condition at packer location. If the well bore is not reasonably round where the packer is seated, a gap can exist between parts of the wellbore perimeter and the packer, which allows fluid and proppant to move across.

    General considerations

    Proper operation of openhole fracturing systems requires attention to several wellbore environmental considerations.

    At the time of installation, downhole tools are exposed to bottomhole temperatures. During fracturing and in the upstream flow, fluid injection gradually cools down these tools until they eventually reach surface temperature. Reduction in temperature causes the downhole tools and tubing string to shrink. For example, if the packed-off interval is 250 ft (76 m) long, a reduction of 100ºF (70º surface vs. 170º downhole) in tubing temperature causes shrinkage of almost 2 in. in the steel string within the packed off interval. Shrinkage imposes stresses on both packers and the connected shell of the steel string (some parts of the tool string, such as the inner sleeve parts, are not rigidly connected to the total string and are free to shrink). Shrinkage can impose additional frictional resistance between moving parts and hamper their free movement or increase the force needed to move the parts.

    Horizontal wells generally are not perfectly straight or horizontal. Even minor bends and twists in the well trajectory, if they occur at critical locations with respect to the tool string, cause misalignment in the downhole string and assembled tools. The stresses imposed can interfere with smooth tool operations.

    In a cased hole, cement bond keeps the casing string in place and prevents its movement during regular well operations. In open holes the production string is free to move sideways. The movement can be caused by fluid flow inside the off-center string. If these movements occur in the more flexible part of the tubing string, they can interfere with the opening of the sliding sleeves.

    While any one of these considerations by itself may not be enough to prevent tool operations, they collectively have the potential to do so.

    Recommendations

    The wellbore area adjacent to each frac port can be isolated by two packers placed at the two ends of the frac port and within a few feet of it. This arrangement can double the total number of packers used in the well (and therefore the total cost of the completion), but there are benefits from using shorter spacing between the packers. There is less thermal expansion of the tubing string between the packers. There is less chance of severe misalignment in the packed-off interval adjacent to the frac port. There is less chance of severe tubing lateral movement. And most importantly, there is a better chance of fracture containment near the frac ports.

    These benefits will increase as the risk of failure is reduced. And attention to the varied issues specific to open holes will increase the probability of successful completion and production operations. 

    楊寶劍 是振威(全球)石油網的高級技術編輯,在石油技術資訊行業有八年的學識和經驗。他源源不斷地提供石油行業全球最新的技術創新、研發成果、現場應用情況等信息。如果你對該項新技術有任何的疑問,或者對“新技術新產品”未來的內容有任何問題或建議,請聯系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎與行業互動!

              您的分享是我們前進最大的動力,謝謝!
    關鍵字: 水平裸眼井 壓裂 
    關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
    Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有
    京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
    五月天婷婷精品免费视频| 国产精品国产精品偷麻豆| 乱精品一区字幕二区| 精品伦精品一区二区三区视频 | 伊人精品久久久大香线蕉99| 国产精品电影一区| 2019国产精品| 99国产精品99久久久久久| 日韩免费无码一区二区视频| 国产精品麻豆免费版| 亚洲AV无码精品国产成人| 亚洲精品中文字幕无乱码麻豆 | 色综合久久夜色精品国产| 91精品国产自产在线观看永久∴| 久久久久久久99精品免费| 免费精品一区二区三区第35| 亚洲色精品88色婷婷七月丁香 | 亚洲综合精品一二三区在线 | 99在线精品视频观看免费| 91精品视频在线| 亚洲精品成人久久| 久久国产精品无码一区二区三区| 老司机福利精品视频| 日韩内射激情视频在线播放免费| 国产精品亚洲片在线花蝴蝶 | 日韩制服国产精品一区| 久久精品一区二区影院| 国产自偷在线拍精品热| 无码日韩精品一区二区三区免费 | 久久亚洲AV无码精品色午夜| 日韩精品无码专区免费播放| 久久96国产精品| 色欲国产麻豆一精品一AV一免费| 久久99视频精品| 99re国产精品| 亚洲理论精品午夜电影| 国产精品爽黄69天堂a| 国产精品日本一区二区在线播放 | 久久精品免看国产| 亚洲日本精品一区二区| 91久久亚洲国产成人精品性色|